New Zealand markets closed

Prosafe SE (PRS.OL)

Oslo - Oslo Delayed price. Currency in NOK
Add to watchlist
37.50-0.50 (-1.32%)
At close: 04:25PM CEST
Full screen
Previous close38.00
Open37.15
Bid37.65 x 4412500
Ask37.85 x 3800000
Day's range37.15 - 38.40
52-week range29.00 - 117.35
Volume5,314
Avg. volume43,433
Market cap670.076M
Beta (5Y monthly)0.49
PE ratio (TTM)N/A
EPS (TTM)-44.25
Earnings date15 Aug 2024
Forward dividend & yieldN/A (N/A)
Ex-dividend date27 Aug 2015
1y target est40.87
  • GlobeNewswire

    Prosafe SE: Operational update – July 2024

    Fleet utilisation for Q2 2024 was 56 percent. In Q2 2024, Safe Eurus and Safe Concordia both achieved 100% utilisation. Safe Notos reached 99%, while Safe Zephyrus had a 98% utilisation due to necessary maintenance work. Prosafe entered into a Letter of Intent (LoI) with Ithaca Energy (UK) Limited for the deployment of the Safe Caledonia at the Captain field in the UK sector of the North Sea starting in Q2 2025. The minimum firm operational period is six months, with an additional three months o

  • GlobeNewswire

    Prosafe SE: Safe Caledonia awarded Letter of Intent

    5th July 2024 Prosafe has been issued a Letter of Intent (LoI) from Ithaca Energy (UK) Limited for the charter of the Safe Caledonia to provide gangway connected accommodation support at the Captain field in the UK sector of the North Sea. The firm duration of the contract commencing June 2025 is 6 months with up to 3 months of options and final contract award is subject to meeting certain site specific technical criteria. The Safe Caledonia will undergo its five-yearly special periodic survey a

  • GlobeNewswire

    Prosafe SE: Operational Update - June 2024

    Oslo, 20 June 2024 Fleet utilisation for May 2024 was 57 percent. All operational rigs, Safe Eurus, Safe Notos, Safe Zephyrus and Safe Concordia, achieved 100 percent utilisation in May 2024. Prosafe entered into a Conditional Letter of Intent (CLoI) for Safe Boreas and will mobilise the vessel from the North Sea within Q2 2025. Safe Boreas will support a project off the coast of Western Australia for a minimum firm operational period of 15 months, with an additional six months of options. Safe